Saipem commissions FDS J-lay tower

Oct. 4, 2007
Saipem has contracted The Engineering Business (EB) for a new J-lay system for its FDS field development ship.

Offshore staff

STOCKSFIELD, UK --Saipem has contracted The Engineering Business (EB) for a new J-lay system for its FDS field development ship.

The system will be equipped for deepwater pipelay, with a maximum dynamic line tension of 1,500 metric tons (1,653 tons), making it one of the world's largest J-lay towers.

EB will design, manufacture, assemble, and test the tower. Construction will be handled at two riverside locations in northeast England. Following pre-delivery testing, the system will be shipped to Rotterdam on a barge for commissioning onto theFDS.

10/04/2007