Offshore staff
ATLANTA, Georgia – MyCelx has contracted to supply Chevron USA with a produced water treatment system for Jack/St. Malo to remove oil and water soluble organics to less than 10 ppm. The design requirements for the Jack/St. Malo floating production facility calls for an overboard discharge limit lower than the current EPA limit of 29 ppm,
The system will be designed to treat 70,000 b/d of water.
04/25/2011