The hull of the Nguya FLNG vessel has been launched at the Wison shipyard.
The 2.4 MMt/yr liquefaction capacity vessel will work alongside the 0.6 MMt/yr Tango FLNG, which started operations for the Eni-led Congo LNG project in December 2023.
Nguya has reached the 80% completion point. According to Eni, the vessel is designed with a reduced carbon footprint and zero flaring.