Eni has asked ABL to perform marine warranty survey services for the offshore transportation and installation of the Marine XII Congo LNG development Phase 2.
Eni has asked ABL to perform marine warranty survey services for the offshore transportation and installation (T&I) of the Marine XII Congo LNG development Phase 2.
The project entails fabrication and T&I of a new FLNG vessel; a converted floating separation, storage and booster unit; wellhead platforms; and associated tie-in pipelines and ancillaries to the location offshore Republic of Congo.
ABL’s scope of work includes a technical review of project and procedural documentation, drawings and calculations, the suitability surveys of the proposed marine fleet for T&I operations, and reviewing and approving onsite attendances for warranted operations.