Drydocks World has begun the construction of a new topside oil production module for KANFA that will be deployed at the Karish Field in the eastern Mediterranean.
KANFA ordered the module, an oil separation train.
Drydocks World’s scope of work covers procurement of bulk materials (structural, piping, electrical and instrumentation), fabrication, surface treatment including PFP application, mechanical completion, load-out and sea fastening for M10.
On completion, the topside module will be transported to the Karish Field for installation and integration onto the FPSO.