Offshore staff
PARIS – Total has awarded TechnipFMC an EPC contract covering subsea equipment for the Zinia Phase 2 field development in block 17 offshore Angola in 800-1,000 m (2,624-3,281 ft) water depth.
The contractor will supply nine subsea trees and associated wellheads, subsea control systems, connection systems, and other equipment.
In addition, TechnipFMC in Angola will provide services to support assembly, test, mobilization, and installation.
07/02/2018