TechnipFMC has contracted Corinth Pipeworks Pipe Industry to manufacture and supply steel pipes for Energean’s Karish gas field development offshore Israel.
The agreement covers 90 km (56 mi) of 24-in. and 30-in. LSAW pipe material for the offshore gas pipeline: this will connect the subsea manifold at a maximum water depth of 1,750 m (5,741 ft) to the receiving terminal onshore.
Pipe manufacture and coating will start at Corinth Pipeworks facility in Greece later this year.