Offshore staff
HOUSTON– BP has awarded OneSubsea, a Schlumberger company, an engineering, procurement, and construction contract to supply the subsea production system for the Mad Dog Phase 2 development in the Gulf of Mexico.
The scope includes subsea manifolds, trees, control system, single and multi-phase meters, water analysis sensors, intervention tooling, and test equipment for producer and water injection wells associated with the project.
In addition, Subsea 7, which collaborates with OneSubsea through theSubsea Integration Alliance, was awarded an engineering, procurement, construction, and installation contract for subsea controls, flexible risers, pipeline systems, umbilicals, and associated subsea architecture.
Offshore installation activities are scheduled for 2019 and 2020.
Project management, including engineering, fabrication, installation support and life of field activities will be managed by US-based resources and operations in both Houston, and Louisiana. Teams from both companies will be co-located to better support project objectives.
03/21/2017