BP contracts Technip for Mad Dog Phase 2 spar FEED

April 30, 2012
BP has awarded Technip (Paris:TEC) a front-end engineering design (FEED) contract for the spar hull and mooring systems for the Mad Dog Phase 2 project in deepwater Gulf of Mexico.

Offshore staff

PARIS– BP has awarded Technip (Paris:TEC) a front-end engineering design (FEED) contract for the spar hull and mooring systems for the Mad Dog Phase 2 project in deepwater Gulf of Mexico.

The Mad Dog Phase 2 spar will be located near Green Canyon block 825. Detailed engineering for the new spar is scheduled to start during the second half of 2012.

This first award comes under the framework of the10-year spar platform master services agreement signed in 2011.

Technip’s operating center in Houston will execute the contract with support from the center in Pori, Finland.

4/30/2012