WGMN worked with South Korean fabricatorSamsung Heavy Industries, providing detailed engineering support for the topsides, delivery of the flare boom, and hook-up/commissioning assistance.
This was the first platform delivered directly from a fabricator in Asia to installation offshore on the Norwegian continental shelf.