Energean books Stena drillship for up to five wells offshore Israel
June 28, 2021
Offshore staff
LONDON – Energean has contracted the drillship Stena IceMAX for a multi-well campaign offshore Israel in 2022-23.
The program comprises three firm wells and two optional wells, with the first firm well likely to spud in 1Q 2022. Energean is looking to de-risk prospective recoverable resources of more than 1 Bboe.
The line-up includes:
Secondly, the more proximate location of the potential development to the expected location of the FPSO Energean Power is also expected to reduce like-for-like development costs when compared with Tanin.
Stena Drilling managed Energean’s previous three-well development drilling program and the 243-MMboe Karish North discovery during 2019-2020.
06/28/2021