Santos has contracted Atteris to perform the subsea, umbilical, risers and flowline pre-FEED for the Dorado field development in the Bedout sub-basin offshore Western Australia.
Offshore staff
PERTH, Australia – Santos has contracted Atteris to perform the subsea, umbilical, risers and flowline pre-FEED for the Dorado field development in the Bedout sub-basin offshore Western Australia.
Water depth is about 95 m (312 ft).
The engineering design work will include the subsea infrastructure connecting the wellhead platform to the disconnectable turret mooring of an FPSO vessel. The subsea system will consist of four flexible risers and associated flowlines including two production lines, one gas injection line and one dynamic and static power and controls umbilical.
Atteris will perform the configuration design of the dynamic riser system, the stability assessment of the flowlines and static umbilical, and the field layout definition.
The Dorado project is a joint venture between Santos (operator) and Carnarvon Petroleum.