Offshore staff
PARIS – Woodside Energy has awarded TechnipFMC an integrated EPCI contract for the Lambert Deep and Greater Western Flank Phase 3 developments offshore northwest Australia.
TechnipFMC will design, manufacture, and install equipment including subsea production systems, flexible flowlines and umbilicals for connection to the Angel platform.
The latter is around 120 km (74.6 mi) northwest of Karratha and is connected to the North Rankin Complex via a 50-km (31-mi) subsea pipeline.
This is the second contract under TechnipFMC’s recent five-year iEPCI frame agreement with Woodside.
Arnaud Pieton, President Subsea at TechnipFMC, said it confirmed “our common ambition to transform subsea economics through integration, standardization and configurability.”
04/21/2020