Offshore staff
The system is designed to protect the export cable, ensuring uninterrupted power transmission from the wind turbines to the shore.
Vos Prodect designed, manufactured, fabricated and delivered the equipment within an eight-week time frame, engineering it for a 35-year lifespan.
08.01.2023