Offshore staff
HOUSTON – Statoil Tanzania AS has contracted KBR (NYSE: KBR) to perform pre-front end engineering and design (pre-FEED) studies for a prospective liquefied natural gas (LNG) facility in Tanzania.
The pre-FEED study is designed to help Statoil further assess the viability of developing an LNG facility to export natural gas from this East African region. The project is expected to be completed during 2013.
10/03/2012