Offshore staff
SINGAPORE – Refurbishment and upgrades continue on the production barge for KrisEnergy’s Apsara oilfield development in Cambodia’s offshore block A.
The vessel entered the Gul drydock in Singapore on March 1 for hull refurbishment and life extension and returned to Keppel’s Benoi yard in April for installation of the living quarters and helideck.
Front-end engineering design has finished for the company’s Rossukon oil development in the G6/48 licence in the Gulf of Thailand.
Elsewhere, PGS’ MGS Apollo has virtually completed acquisition of a 2,720-sq km (1,050-sq mi) 3D seismic survey over the company’s non-operated Andaman II production-sharing contract in the Malacca Strait, offshore North Sumatra.
05/13/2019