Offshore staff
HOUSTON – Brunei Shell Petroleum has contracted McDermott International to transport and install offshore structures for the Champion Waterflood B2/3 scheme.
The scope includes installation of four jackets in 25-30 m (82-98.4 ft) of water. McDermott expects to complete the work this summer.
03/07/2014