This is a production capacity improvement plan that is aimed at boosting production from the giant offshore Al Shaheen Field, 70 km northeast of Ras Laffan, by about 100,000 bbl/d of oil.
A team of ABS analysts team will lead a safety engineering program designed to provide risk mitigation and asset integrity support. ABS will also perform various studies including dropped object analysis for subsea pipelines and cables.