PARIS, France — HD Hyundai Heavy Industries has commissioned GTT to design the tanks for the new FSRU on behalf of Japanese shipowner Mitsui O.S.K. Lines.
The tanks, with a total capacity of 170,000 cu. m, will be equipped with the GTT-developed Mark III membrane containment system.
The completed vessel is due to be delivered in third-quarter 2027.