Pipelay is under way offshore Myanmar to take natural gas 230 km (143 mi) from Zawtika field to shore.
Offshore staff
HOUSTON –Pipelay is under way offshore Myanmar to take natural gas 230 km (143 mi) from Zawtika field to shore. The field is operated by PTTEP International.
Installation of the line is being supported by Hallin Marine’sPenrith DP-2 offshore support vessel with third-party work-class ROV.
The ROV will check free spans, and those exceeding specification will be infilled with grout.
For the latest on upstream oil and gas operations in the Asia/Pacific arena,click here.