Offshore staff
ABERDEEN, UK – Balmoral’s ‘Discovery Unit’ has developed an integrated cable protection system (CPS) for offshore wind installations.
The patented system, which is available in three standard sizes, includes a combination of bend restrictors and a bend stiffener, foundation interface device, standard dynamic unit, and a detachable pull head.
Solutions for varying apertures on monopile installations are available as well as J-tube and I-tube options for jacket structures, the company said.
Dr Aneel Gill, product R&D manager, said: “Our systems are designed based on the fatigue limit state and offer something different because of their unique diverless removal feature and the ability to account for free span caused by scour development.
“Our patented fiber reinforced technology adds stiffness to the system controlling the curvature during the project lifespan. This reduces the amount of movement experienced by the cable, improving fatigue performance and greatly reducing the risk of failure through the life of field.
“The low weight components of the system permit efficient transportation, handling and assembly on deck. The system also allows for diverless removal of the CPS should cable maintenance be required.”
07/14/2020