This is the company’s 16th and largest offshore facility to date and its first compression platform, designed to produce low-pressure gas resources from the Greater Cassia Area. It is connected to the Cassia hub, 35 miles from Trinidad’s southeast coast.
At peak, Cassia C should deliver 200 MMcf/d to 300 MMcf/d of gas.
TOFCO (Trinidad Offshore Fabricators) built the jacket and supporting frame while McDermott’s yard in Altamira, Mexico, constructed the topside structure.