The scope includes design finalization, procurement management, and inspection services for 17 production and water injection top-tensioned risers and one high pressure drilling riser. The 2H Offshore Houston office will be responsible for this phase of the project.
Moho Nord is 75 km (47 mi) from Pointe-Noire and 25 km (15.5 mi) west of N’Kossa in water depths ranging from 450 m (1,476 ft) to 1,200 m (3,936 ft).