According to operator Masirah Oil, a third well will follow on completion of Yumna 2.
All three production wells have been placed to optimize reservoir drainage and to maximize recovery, the company added, with a wildcat exploration well also planned during the 90-day campaign to assess a nearby lookalike prospect.