Statoil to upgrade Snorre safety

April 23, 2006
New control module designed to improve safety standards on North Sea Snorre complex

Offshore staff

(Stavanger) Leirvik Module Technology is to supply a new module for Statoil's Snorre A platform, comprising a control room, cabins and galley. Pre-fabrication of the NOK 125 m structure should start in June, followed by installation by a heavy lift vessel in mid-2007.

Statoil claims the new control room should improve safety on this North Sea semisubmersible � Snorre A suffered a blow-out in 2004. It should also open the way to more integrated field operations with a land-based complex.

04-23-06