The vessel, which will be stationed around 100 km (62 mi) south of Dakar, will be capable of processing 100,000 b/d of crude oil, 130 MMcf of gas and 145,000 bbl of injection water, with a minimum crude storage capacity of 1.3 MMbbl.
Palfinger’s two DKW1600 cranes will provide a lifting capacity of up to 30 metric tons and a maximum outreach of 35 m (115 ft) to the FPSO.