Corinth Pipeworks supplying pipes for Fenix project offshore Argentina
Sept. 27, 2022
Corinth Pipeworks will manufacture 40 km of 24-inch longitudinally submerged arc welded steel pipes for the Fenix Phase 1 gas export pipeline offshore Tierra del Fuego, Argentina.
MAROUSSI, Greece— Corinth Pipeworks will manufacture 40 km of 24-inch longitudinally submerged arc welded steel pipes for the Fenix Phase 1 gas export pipeline offshore Tierra del Fuego, Argentina.
The Fenix gas field is part of the Cuenca Marina Austral (CMA-1) license, operated by TotalEnergies. The company and its partners recently sanctioned development via a new minimum-facility wellhead platform exporting the production to the Vega Pleyade platform, for onward delivery through the existing pipeline to the shore.
Corinth’s scope includes external 3LPE anti-corrosion coating and concrete weight coating, to be applied at the same location as pipe manufacturing in Thisvi, Greece.
Offshore installation is scheduled to start in 2023.