BW Offshore will operate the FPSO under contract toPremier Oil at its Catcher oil field in the UK central North Sea. The floater has a processing capacity of 60,000 b/d and a storage capacity of 650,000 bbl.
The Catcher Area development, 180 km (112 mi) east of Aberdeen, includes the Catcher, Varadero, and Burgman oil and gas fields.
TMC supplied a compressed air system comprising three 185-kW instrument/service air compressors and two instrument/service adsorption air dryers.