Enping project offshore China includes typhoon-operable unmanned platform

Dec. 7, 2022
CNOOC has produced first oil from the Enping 15-1/10-2/15-2/20-4 oil fields development in the eastern South China Sea.

Offshore staff

HONG KONG  CNOOC has produced first oil from the Enping 15-1/10-2/15-2/20-4 oil fields development in the eastern South China Sea.

Facilities include two drilling production platforms and one unmanned wellhead platform, with 48 production wells due to be commissioned. Average water depths are close to 90 m.

CNOOC anticipates peak production of about 35,500 bbl/d in 2024.

The new unmanned platforma first for this area of the South China Seacan conduct remote production under typhoon mode.

CNOOC plans to drill one CO2/gas injection well for reinjection and storage of produced CO2, making this China’s first offshore carbon capture and storage demonstration project.

12.07.2022

Related

Photo 49467510 © Nightman1965 | Dreamstime.com
Africa
Photo 194360590 © Zenobillis | Dreamstime.com
Gulf Of Mexico Hurricane