The well is being drilled in 380 ft (116 m) of water on theDussafu Marin PSC.
It is designed to test stacked post-salt Madiela and presalt Gamba and Dentale reservoir targets to a planned TD below sea level of 10,500 ft (3,200 m). Drilling is expected to last 40 days, but the program may be extended for test/evaluation purposes in the event of a discovery.