COMPLETIONS TECHNOLOGY: Large monobore completions prevent high-volume gas well flow restrictions

Dec. 1, 2001
Classifying monobore completions

Recent advances in wellbore construction technologies and processes have enabled value to be derived from methods that simplify traditional completion schemes. Among these innovations are large-bore monobore completions (using 6 5/8-in. and larger tubulars), which are becoming increasingly common for production and injection applications in prolific, high profile gas reservoirs.

The larger production tubing provides increased flow area, while the monobore scheme reduces flow restrictions. Other benefits include:

  • Elimination of gas turbulence areas and restrictions on production and use of intervention tools
  • Earlier return on investment
  • Exploitation of the reservoir through fewer wells and fewer slots on a platform
  • Possible elimination of one or more platforms
  • Lower long-term operating expense from quicker depletion of the reservoir and fewer wellbores
  • Lower topsides and maintenance expenses.
After a successful integrity test, the completion string, consisting of subsurface safety valve and seal assembly, are run in the well and the seals are stabbed into the PBR.
Click here to enlarge image

Large-bore completions have been installed in monobore, deepwater, and extended-reach wells, in cemented-liner, open-hole, and sand-control applications. The advantages cited can improve net present value (NPV) and overall project economics by hundreds of millions of dollars. For example, Conoco has reported that it improved overall project economics of the North Sea Heidrun Tension Leg Platform (TLP) by more than $108 million by using 7-in., rather than 5 1/2-in., tubing and tree.

Emphasis on reliability

Achieving accelerated production with fewer wells places greater emphasis on reliability. The negative impact on production of one large-bore well that is unable to flow is significantly greater than in conven- tional completion scenario. Thus, it is important to gauge reliability for large-bore completions not only on the basis of components, but also, and to an even greater extent, for the entire system.

As with Level 1, the completion occurs during the drilling process. Two options are available for completion liner cementation: (1) conventional cementation, as described in the APEX Level 1 completion; or (2) inner string cementation.
Click here to enlarge image

This systems approach is in stark contrast to the discrete equipment view or even departmentalized app-roaches to improving reliability. No longer can relia- bility be improved by improving a component's reliability without knowledge of its interaction within the system. Similarly, no longer can reliability and cost efficiencies be achieved wholly through the efforts of the "completion department" without consideration of the traditional "wellbore construction/drilling departments" and "workover department." The real opportunity for reliability and cost efficiencies in monobore completions is in the integration of these three disciplines/departments/considerations, resulting in a fully integrated, fit-for-purpose, "fit-for-life of-the-well" completion.

Large-bore classification

Through appraisal of more than 350 documented case histories spanning some 20 years, Baker Oil Tools identified four different methods of large-bore completions and established these methods, or "levels," as the basis of its APEX big-bore classification system. This is designed to evaluate and select the best-integrated completion solution for lowering both risk and overall project cost in specific large-bore applications.

The various levels are differentiated by when the completion occurs, the location, types of seals used in the upper and lower (reservoir face) completions, and the type of isolation that results. The classification system compares each completion level according to functionality and risk to reward as follows:

(1) The first two large-bore completion system levels are classified as wellbore construction completions, because they are reservoir-face completions that take place during the drilling process. Applicability of these systems is based on liner top load analysis and the operator's completion philosophy. The primary benefit of wellbore construction completions is their operational simplicity. Well-specific costs and risks involve completing in a drilling environment. Risk reduction includes contingencies to convert to an isolation completion if necessary. Within this classification, Level 1 large-bore completions are cemented, with the primary barrier being cement in the lower completion. Level 2 large-bore completions add an integral packer in the lower completion.

(2) The second two large-bore completion system levels are classified as isolation completions. These are run as upper completions to protect and/or repair the lower completion. Applicability of these systems is based on trapped volume analysis and operator completion philosophy. The primary benefit of isolation completions is the additional well protection they provide. Well-specific costs and risks include installation of additional components. Risk reduction includes use of single-source, fully integrated completion components.

Within the isolation completions classification, Level 3 large-bore completion systems provide single zone isolation by adding an annular barrier in the upper completion to a Level 1 cemented completion system. Level 4 large-bore completion systems provide dual zone isolation by adding an annular barrier in the upper completion to a Level 2 integral packer completion system.

Operating experience

Following are experience summaries for the four levels of large-bore completion systems.

In this most basic of completions, the liner is run, hung, and cemented. Another trip is made to clean and polish the polished bore receptacle (PBR). The integrity of the liner top can then be tested by a variety of means. If the integrity test fails, subsequent remedial cementing may be required, or the scheme can be converted to a Level 3, using a liner top isolation packer. After a successful integrity test, the completion string, consisting of subsurface safety valve and seal assembly, are run in the well and the seals are stabbed into the PBR.

Click here to enlarge image

As with Level 1, the completion occurs during the drilling process. Two options are available for completion liner cementation: conventional cementation, as described in the APEX Level 1 completion, or inner string cementation. In either case, after cementation, the integral liner packer is weight-set, using the drill pipe. An integrity test can then be performed and the completion assembly run and tested.

Click here to enlarge image

After a Level 1 completion is installed, a compression set packer is run, stabbed into the existing liner top, and set with compression of the drillpipe. On the final trip, a completion-type anchor seal assembly is run on the completion string, along with the safety valve. After the necessary space-out is determined using the snap-in/snap-out feature, the tubing is landed and the seal assembly is anchored in place.

Click here to enlarge image

No rotation is required during this completion process. The seal assembly could be a rotational and/or shear release, for redundant methods of retrieving the tubing, should the well require a workover. Many Level 3 completions have been run in Colombia, Norway, and the UK using a hydraulic set packer in place of the compression set packer.

Click here to enlarge image

After a Level 2 completion is installed, a PBR, interventionless hydrostatically set packer, landing nipple, and tieback stem are run and located in the top of the liner PBR. Applying pressure to a rupture disk allows the packer to hydrostatically set. Days of rig time are saved using remotely actuated packers.

Click here to enlarge image

Over 70% of all large-bore completions to date have been Level 4 completions using either a compression-set or hydraulic- set upper packer. These completions have been utilized routinely in Indo-nesia, Australia, the East Coast of Canada, Norway, Myanmar, Holland, UK, Denmark, China, and Peru.

After a Level 1 completion is installed, a compression set packer is run, stabbed into the existing liner top, and set with compression of the drillpipe. On the final trip, a completion-type anchor seal assembly is run on the completion string, along with the safety valve.
Click here to enlarge image

To enhance production rates, a unique natural gas lift completion has been installed above a horizontal section of each well. This upper completion required the design of a fit-for-purpose hydraulic production packer and PBR with feed-throughs. A short cased hole gravel pack was installed across the gas cap in combination with 8 5/8 in. blank pipe and extended longevity sand screen. This allowed for a 7-in. tubing string to be stabbed through the upper completion, leaving a 5.75-in. ID through the lower zone. A combination of wellbore construction and conventional completion equipment was used to meet the large internal diameter requirements.

Growing portfolio

Most current experience in large-bore completions has been with 7-in. tubulars. However, 9 5/8 in. completions have been run since the early 1990s in Western European gas storage caverns and in the prolific land-based gas fields of Indonesia. These completion schemes were very simple, relying on wireline-retrievable safety valves or, in the case of remote land-based locations, no safety valve at all.

Over 70% of all large-bore completions to date have been Level 4 completions using either a compression set or hydraulic set upper packer.
Click here to enlarge image

Later in the decade, as interest rose in 9 5/8 in. completions, companies began expanding their portfolios of equipment for these completions. Much of the activity centered around development and qualification of a 9 5/8 in. tubing retrievable safety valve. Knowing these valves would most likely be used exclusively in high rate gas wells, the capability of the flapper to slam shut against high flows was a critical concern.

To enhance production rates, a unique natural gas lift completion has been installed above a horizontal section of each well. This upper completion required the design of a fit-for-purpose hydraulic production packer and PBR with feedthroughs.
Click here to enlarge image

These valves passed extensive and rigorous validation testing, including multiple slams against maximum flow rates of 480 MMcf/d and at a velocity of 255 ft/sec, as presented in the OTC 11881 paper. By reviewing wellbore construction and completion economics, a 9 5/8 in. safety valve that could fit inside 13 3/8 in. casing instead of 16-in. casing was developed. As a result, operators can now reduce wellbore construction costs while increasing production rates using smaller casing designs.

A wealth of completion tools, including hydraulic and compression set packers, nipples and plugs, are now available for 9 5/8 in. by 13 3/8 in. completions. Thus, the industry now has a full portfolio of wellbore construction, completion, and workover tools for use in ultra-large-bore completion projects currently underway and being discussed.