The contracts cover the structural grouting for the 8,000-metric ton (8,818-ton) Solan platform jacket and its 300,000-bbl subsea storage facility, in water depths of 135 m (443 ft).
FoundOcean will also pile-grout the offloading system base, which will carry oil from the subsea storage facility to a shuttle tanker. Offshore work is expected to start this summer.