ICS Triplex to deliver first UK-built turbine and compression control system

May 9, 2008
ICS Triplex has delivered its first UK-built turbine and compression control system to CNR International (UK) Ltd. (CNRI).

Offshore Staff

MALDON, UK -- ICS Triplex has delivered its first UK-built turbine and compression control system to CNR International (UK) Ltd. (CNRI).

The Trusted T6300 system, built at the headquarters of ICS Triplex in Maldon, was completed in March 2008 and will be installed onto CNRI's Murchison platform in the North Sea during 2009. Once installed, it will monitor and control a gas-lift process that has been introduced to help increase oil production in the Murchison field.

05/09/2008